PRODUCTSCASE SHOW

Focuses on the research, development, production and manufacturing of high-performance polymer pipes

Adjustable temperature pipe flaring tool

  • The automatic flanging machine produced by our company is an automated production equipment integrating functions such as heating, flanging, and cooling and shaping, specifically designed for flanging pipes. This equipment adopts advanced automatic control technology and can efficiently and accurately complete the flanging work of pipes, improving production efficiency and reducing labor costs. It is an important device in the modern plastic pipe processing industry.
Consult
Hotline+86 0512-57420512

Detailed introduction

未标题-3.png

Equipment parameters

 device name

Flanging heater

 unit type

JRQ-01

Input power supply

AC220V  50Hz

Product power

500W

Applicable products

PTFE pipe, F46 pipe, nylon pipe, PVC pipe, etc

Temperature adjustment range

50 to 350 degrees Celsius

Flexible tube diameter

Outer diameter 3, 4, 5, 6, 8, 10

 heating-up time

30 S~50S

Temperature control accuracy

0.1 degrees

Flip the cycle

2~3 per minute

Equipment exterior parameters

Length 120, width 105, height 140

Product weight

1.75 KG

Operation instructions

wechat_2025-07-31_155204_594.png

1. Insert the power cord of the device and turn on the power switch (as shown above).

2. Set the required temperature on the thermostat:

图片3.png

The green temperature is the set temperature, and the red temperature is the current heater temperature;

Adjust the temperature upward by the arrow, and adjust the temperature downward by the arrow. After setting the temperature, the value is automatically saved;


3、Start the heating of the tube. According to the diameter of the tube, the heating time will be different. It is expected to take 10~15S. Then, the flanging (flanging duration is about 10S) is carried out. After the flanging is completed, it needs to be cooled at the cooling plate position (cooling time is about 5S).

 

4、Replacement of heating head: The flange of different diameter tubes needs to correspond to heating head of different diameters. The replacement of heating head is as follows:

wechat_2025-07-31_155541_485.png

Note: After the heating head is removed, in order to prevent the falling off of the fixing screws behind it, a new heating head needs to be replaced immediately


Factory parts

1、Heating head (default two specifications);---------2;

2、Three-core power cable----------------------1;

3、Fitting tool------------------------1 set;


图片4.png图片5.png图片6.png

Warranty and Customer Service:

1、The whole machine is guaranteed for one year, except the heating head (guarantee for three months);

2、Technical support contact: Li Gong 13776227603, wechat: lbb3210



昆山诺亚舟环保科技有限公司Consult customer
Hotline

Hotline

+86 0512-57420512

Whatsapp
昆山诺亚舟环保科技有限公司
Return